Presently Southern Region is facing severe power shortage. As per Operational data, the region faced Power deficit of about 8.4% (i.e about 3270MW) during 2014-15 (Apr'14- Feb'15). This power deficit situation has arisen mainly due to (i) delay/deferment of anticipated generation projects and (ii) also due to non‐availability of gas for existing gas projects in Southern Region. Presently the existing/planned system can facilitate import of about 9000 - 10000 MW into Southern Region. However under certain scenarios of non‐availability / delay in commissioning of some of the generation projects in Southern region expected power transfer requirement is about 16000 MW by 2018-19. In view of large deficit and requirement of transmission system to meet future power transfer requirements, high capacity Inter-regional strengthening schemes were identified. The Present Scheme is part of the above identified scheme.

To facilitate import of power from North-East-West (NEW) grid to Southern Region grid, Angul – Srikakulam – Vemagiri corridor was envisaged and is under implementation. Under present proposed scheme, a 765kV D/c from Vemagiri to Cuddapah via Chilakaluripeta, wherein a 765/400kV Substation has been proposed, which would facilitate dispersal of power beyond Vemagiri. Further High capacity 400kV D/c have been proposed from Vemagiri, Chilakaluripeta and Cuddapah for Injection/ dispersal of power.

Project Elements

Transmission Lines:

Vemagiri-II – Chilakaluripeta 765kV D/c line with 240 MVAR switchable line reactor at both ends.

Chilakaluripeta – Cuddapah 765kV D/c line with 240 MVAR switchable line reactor at both ends.

Chilakaluripeta – Narsaraopeta 400kV (quad) D/c line.

Cuddapah – Madhugiri 400kV (quad) D/c line with 80 MVAR switchable line reactor at both ends.

Srikaukulam Pooling Station – Garividi 400 kV (Quad) D/c line with 80 MVAR switchable line reactor at Garividi end.

Substation:

Establishment of 765/400 kV substation at Chilakaluripeta with 2x1500 MVA transformers and 2x240 MVAR bus reactors each.

Transformers: 765/400kV, 7x500 MVA (one spare unit)

765/400kV Transformers bays at Chilakaluripeta: 2 nos.

765 kV

Line bays : 4 nos.

Spare bays : 6 nos.

400 kV

Line bays : 2 nos.

Spare bays : 8 nos.

Name of project specific SPV

Vemagiri II Transmission Limited

Name of the successful Bidder

M/s Power Grid Corporation of India Limited

Date of transfer of SPV to successful Bidder/Effective

04.12.2015

Scheduled COD of the Project

04.04.2019

Levelized Transmission tariff of successful Bidder

3592.55 Millions

Results

Results of Financial Bids

Click here to view Grid Map

Click here to view Comparitive Transmission Charges

 

Our locations


Corporate Office

ECE House, 3rd Floor, Annexe - II,
28A, KG Marg, New Delhi - 110001

Registered Office

Core-4, Scope Complex7,

Lodhi Road,New Delhi – 110 003

Get in touch


Tel: 011-47964796

Fax: 011-47964747

Youtube Channel