Presently the power supply to the valley is through Kishenpur – Wagoora 400 kV D/c, Kishanpur- Pampore 220 kV D/c and Udhampur – Pampore 132 kV D/c. Kishanpur_newwanpho 400 kV D/c is under construction. All the existing and under construction line are rooted through Udhampur – Batote – Banihal – PirPanjal pass. The common corridor of the transmission line is highly prone to snow storm, land slides and other natural calamities making power supply to the Kashmir valley vulnerable. There was a complete collapse of power supply to Kashmir valley on 6th and 7th Jan.'12 due to heavy snowfall and breakdown/tripping of all three existing links between Jammu region and Kashmir valley. Further power supply to Jammu and Kashmir is basically through 400/220 kV Kishanpur substation and there is an immediate need for providing an alternate route for transfer of power from Jammu region to Kashmir valley. Further to need the high load growth anticipated in northern part of Kashmir and to cater to projected loads, a 400/220 kV substation at Amargarh in North Kashmir area is required. Accordingly to mitigate above constraints present scheme has been proposed.

Under the present scheme Establishment of 400/220 kV substation at Amargarh along with Loop in Loop Out (LILO) Uri – Wagoora 400 kV D/c has been proposed. The substation would be further connected to the grid through Jalandhar – Samba – Amargarh 400 kV D/c line. The Samba – Amargarh line should be routed via Akhnoor and Rajouri. This would have dual benefit i.e. the line would be constructed through a different corridor which is away from the existing line corridor as well when the demand in Akhnoor/Rajouri increases new 400 kV substations can be established by LILO of proposed 400 kV Samba – Amargarh line. Amargarh is close to Uri and getting corridor for LILO would be difficult. Accordingly multi circuit towers would be used near Amargarh substation for LILO work. Accordingly following elements are proposed under NRSS-XXIX:

Project Elements

Establishment of 7 x 105 MVA, 400/220 kV GIS substation at Amargarh

Jalandhar – Samba 400 kV D/c

Samba – Amargarh 400 kV D/c routed through Akhnoor & Rajouri

LILO of both circuits of Uri – Wagoora 400 kV D/c line at Amargarh

Name of project specific SPV

NRSS XXIX Transmission Limited

Name of the successful Bidder

Sterlite Grid Limited

Date of transfer of SPV to successful Bidder/Effective Date

4th August, 2014

Scheduled COD of the Project

4th October, 2018

Levelized Transmission tariff of successful Bidder

Rs. 4377.05 million per annum

Result

Result of financial bids

Click here to view Grid Map

Click here to view Comparitive Transmission Charges

 

Our locations


Corporate Office

ECE House, 3rd Floor, Annexe - II,
28A, KG Marg, New Delhi - 110001

Registered Office

Core-4, Scope Complex7,

Lodhi Road,New Delhi – 110 003

Get in touch


Tel: 011-47964796

Fax: 011-47964747

contactus@rectpcl.in

Youtube Channel