Gadarwara (Part-B)
NTPC Limited (NTPC) is establishing coal based Gadarwara STPS of 2 x 800 MW generation project at Gadarwara, Narsinghpur District in the State of Madhya Pradesh. NTPC Limited has been granted LTA for 1586.51 MW as per the LTA application & the details of drawl of power is given below:
CSPDCL |
63.46 MW
|
MP Tradeco |
793.25 MW |
GUVNL |
209.86 MW |
MSEDCL |
261.49 MW |
Goa |
10.47 MW |
DNH |
6.03 MW |
DD |
3.96 MW |
Unallocated |
237.99 MW |
The Transmission System Strengthening was planned for the evacuation & supply of power from the Gadarwara STPS to the beneficiaries of the generation project which include Gadarwara STPS – Jabalpur Pool 765 kV D/C line, Gadarwara STPS – Warora Pool – Parli – Solapur 765 kV D/C line.
This transmission system strengthening shall facilitate immediate evacuation as well as supply of power to its beneficiaries with reliability & security. Beyond Solapur dispersal of power to the beneficiaries of the generation project shall be through existing/planned transmission network under inter-state Transmission System. The Transmission System has been split into two parts viz. Part A and Part B.
Note: Transmission System Associated with Gadarwara STPS (2 x 800 MW) both part-A and Part-B Transmission System are to be implemented in the same time frame.
Project Elements |
Gadarwara STPS – Jabalpur Pool 765 kV D/C line* Warora (Pooling Station) – Parli (New) 765 kV D/C line. Parli (New) – Solapur 765 kV D/C line Parli (New) – Parli (PG) 400 kV D/C (Quad) line Establishment of 2 x 1500 MVA 765/400 kV Parli (New) S/S 765 kV ICTs: 7 x 500 MVA, 765/400 kV (1 spare unit) ICT bays: 2 no. Line bays: 6 no. Bus reactor: 3 x 110 MVAR Bus reactor bay: 1 no. Line reactors: 7 x 110 MVAR (1 unit spare) (for Gadarwara line) Line reactors switchable: 6 x 110 MVAR (for Parli line) Space for future bays: 4 no. 400 kV ICT bays: 2 no. Line bays: 4 no. Space for future 400 kV bays : 4 no.
|
Name of project specific SPV |
|
Name of the successful Bidder |
M/s Power Grid Corporation of India Limited |
Date of transfer of SPV to successful Bidder/Effective Date 24.04.2015 |
24.04.2015 |
Scheduled COD of the Project |
January, 2018 |
Levelized Transmission tariff of successful Bidder |
2567.26 millions |
Result |
|
|
|